Power cycling the PC, HPLC, and MS to solve communication problems|質量分析計・LC-MS/MSシステムのSCIEX


日付: 03/20/2017
カテゴリー: Mass Spectrometers

0 投票
   印刷する    記事を評価する:

For research use only. Not for use in diagnostic procedures.


Issue Description

After submitting samples and starting the queue, the queue status window reads “Waiting”, while all of the status icons at the bottom right of the screen are green and are reading “Ready”. After restarting Analyst® software, the queue status window continues to read, "Waiting."


Resolution

  1. Save batch, methods, and any other open workspaces in AnalystUser-added image
  2. Deactivate hardware profile 
  3. Exit Analyst and “Stop” Analyst Service User-added image
  4. Shut down computer (shut down, not restart)
  5. Power off all connected peripherals including pumps, autosamplers, and column ovens.
  6. For SCIEX 3500, 4500, 5500, 6500, and 6500+ instruments, hold the red “RESET” button on the side of the MS for 3 seconds and release. On API3200, API4000, and API5000 instruments, turn the power off for a total of 3 seconds using the main power switch on the rear of the MS.
  7. Wait approximately 5 minutes for the MS to power cycle and resume operating pressure. Once the Vacuum indicator light is solid green, the MS has reached operating pressure. User-added image
  8. Power on the connected peripherals and wait for the startup cycle for each component to complete
  9. Power on the PC
  10. Open Analyst, activate hardware profile, and resume normal operation

Posted: Oct 20, 2021

Is it recommended to reset the instrument with the reset button? We have 5500QTrap, 6500+QTrap und 7500QTrap. And I heard that it is not recommended anymore to reset the instruments with the rest button