How Do You Convert a Non-scheduled MRM Method to a Scheduled MRM Method in Analyst?|質量分析計・LC-MS/MSシステムのSCIEX


日付: 04/25/2017
カテゴリー: Analyst Software

0 投票
   印刷する    記事を評価する:

For research use only. Not for use in diagnostic procedures.


Answer

To convert non scheduled MRM (MRM) to scheduled MRM (sMRM), select enabled under Scheduled MRM. You will notice that the time column will change from the msec (dwell time) to min (Retention time). Update time column with the retention time of each transition. Then, go to File, Save As, give this method a new name. 

Non-scheduled MRM method

User-added image


Scheduled MRM method
User-added image